How Long Does It Take to Install an EV Charger in Toronto?

Installing a home or commercial EV charger in Toronto involves more than simply connecting a charging unit—it's a carefully coordinated process that takes into account electrical load capacity, permitting, safety inspections, and future readiness.

With the increasing number of electric vehicles across the GTA, EV charger installation in Toronto is becoming a growing priority for both homeowners and businesses alike.

Initial Inspection and Planning

Installation begins with an on-site evaluation by a licensed electrician. This inspection determines whether the current electrical system can handle the load required for an electric car charging station installation. For residential properties, the existing panel typically must support a 40-amp or 60-amp breaker, depending on the charger's power level.


During this phase, the contractor assesses:

  • Panel capacity

  • Distance from the panel to the charger location

  • Wiring needs

  • Grounding and bonding compliance

  • Future scalability (e.g., dual charger setups)

In most cases, the assessment takes less than two hours and can be scheduled within a few days of inquiry, depending on technician availability.

Permits and ESA Approval Timelines

Electrical work in Toronto requires adherence to the Electrical Safety Authority (ESA)

regulations. With-in 48 hours of the installation beginning, a permit application must be submitted to the ESA.

For most EV charger installations in Toronto, this process typically takes one to three business days. However, the timeline may vary if upgrades to the main panel or service entrance are needed.


ESA inspectors may also request a post-installation visit for verification of Ontario Electrical
Safety Code compliance.

Delays occur if:

  • The home requires service upgrades

  • The charger placement is far from the panel

  • There are structural modifications required

Permit acquisition and approval remain the key scheduling factors and must be considered in any timeline estimate.

Installation Day Overview

Once planning is complete and permits are issued, the installation of the electric car charging station begins. Most Level 2 residential charger installations can be completed in one day, typically within three to six hours. For commercial projects or installations involving longer cable runs, the timeframe may extend to a full workday or require multiple visits.


During installation, electricians perform the following:

  • Mounting the charger appropriately on the wall or pedestal

  • Running dedicated wiring to the breaker panel

  • Installing breakers and safety disconnects

  • Grounding the system according to the code

Weather conditions and site accessibility can also impact the duration. Installers typically prepare for unforeseen conditions to minimize the need for return trips.

Testing and Commissioning Process

After the charging station is installed, the system undergoes functional testing.

This includes:

  • Verifying current draw and voltage

  • Confirming the charger communicates with connected vehicles

  • Testing Ground Fault Circuit Interrupter (GFCI) responses


A successful test confirms whether or not an EV charger installation in Toronto meets ESA requirements and manufacturer guidelines. In the event of a failed test or code discrepancy, minor corrections are completed on the same day, followed by a re-inspection if necessary.

Post-Installation Service and Documentation

After installation is completed, clients receive:

  • ESA Certificate of Acceptance

  • Installation summary with photos (if requested)

  • Recommendations for routine maintenance


The process doesn't end with the installation. Ongoing system performance depends on periodic checks and visual inspections, particularly in shared spaces or outdoor setups. Qualified electricians recommend reviewing charging patterns and charger status indicators every few months to prevent long-term wear and tear.

Estimated Total Timeline

For a standard residential EV charger installation in Toronto, the whole process—from initial call

to completed installation—typically takes 5 to 10 business days. This estimate assumes no

panel upgrades or complex wiring challenges. Commercial installations or projects involving

older homes may extend the timeline to 2 to 3 weeks, depending on ESA inspection scheduling, local hydro supplier scheduling, and material procurement.


By following structured steps—site assessment, permitting, hardware installation, and testing—installation timelines remain predictable and safe.

Final Thoughts

Installing an electric car charger in Toronto is not a same-day service but a coordinated electrical project subject to local regulations, safety protocols, and infrastructure readiness. Timelines vary based on property condition, panel capacity, and approval windows.

Contact Canadian Wire Wizards to book a site assessment or request information on ESA-compliant electric car charging station installation services across the GTA.
Posted in Lighting 17 hours, 1 minute ago
Comments (0)
No login
gif
Login or register to post your comment